毕业设计中文摘要翻译成英文的,别用机器翻译。。。谢谢

2024-04-03 03:52:59
推荐回答(1个)
回答1:

This engineering is in TieSiJu ShiWu high-speed passenger railway SZ - 3 section, constructing zhanghe zhangzhuang DK476 + 758.896 ~ bridge DK479 + 176.896, DK454 + 483.414 ~ DK458 + 058.414 segment of the shop without a frantic jumble rail board coarse and fine tuning and grouting work, totaling laying track board 2351 pieces